Semester
Spring
Date of Graduation
2017
Document Type
Problem/Project Report
Degree Type
MS
College
Statler College of Engineering and Mineral Resources
Department
Industrial and Managements Systems Engineering
Committee Chair
Steven Guffey
Committee Co-Chair
Kevin He
Committee Member
Marc Wamsley
Abstract
Central Supply Company was interested in having a noise survey completed at two locations, a concrete batch plant and a block manufacturing plant. Noise levels were measured to evaluate the current hearing conservation program and to determine potential overexposure, compliance, and appropriateness of protection. Employee dosimetry results showed that sound levels at the concrete batch plant were not high enough to require employee enrollment in a hearing conservation program. At the block manufacturing plant, employee dosimetry results showed there was a need for a hearing conservation program, including a need for hearing protection to be worn at all times during production.
Recommended Citation
Drelick, Janice, "Central supply company noise survey." (2017). Graduate Theses, Dissertations, and Problem Reports. 3983.